Pit, plant and infrastructure
The pit, plant and production infrastructure are located at the Altyn Tor site of the Solton Sary deposit. Avelum Partner develops the project jointly with Kyrgyzaltyn OJSC.

Mining work
Work at the Altyn-Tor site is being carried out as part of a project to refine the open-pit reserves of the Solton-Sary gold deposit.

Processing plant
The factory is undergoing a complete modernization with changes in the technological scheme and replacement of worn-out equipment.

Laboratory and pilot tests
The tests help select a process for concentrating and recovering metal from the plant’s existing tailings.