Selecting a process for existing tailings
Laboratory and pilot tests have been carried out using modern equipment since the start of 2022.
Central Research Laboratory of JSC "KGRK"Kara-Balta.
LLC "Altyn group KG"Kara-Balta.
LLC "NPF ElectroGidroDynamika", St. PetersburgRussia.
LLC "PRO Eurasia", MoscowRussia.
Planned steps after testing
- 01Process specification
- 02Tailings processing design
- 03Construction of the processing line