New equipment for crushing and screening unit
- Jaw crusher1 pc.
- Double-deck screen1 pc.
- Vibrating feeders2 pcs.
- Roll crusher DVG-2x10001 pc.
- Belt conveyors10 pcs.
What changes at the plant
Ore size
- Before modernisation
- 40–60 mm
- Expected after modernisation
- 10–15 mm
Mill throughput
- Before modernisation
- 3–4 t/h
- Expected after modernisation
- 12–15 t/h
Targets, not verified operating results. Expected throughput is 12–15 t/h and above.
The modernisation programme anticipates an approximately 4–5-fold increase in mill throughput.
Under the revised process flowsheet, four sets of Nelson-type centrifugal concentrators and a bank of BGC-250x3 hydrocyclones have been prepared for installation. The equipment is expected to improve metal recovery from ore.