General provisions
Customer: Limited Liability Company "Avelum Partner".
Address: Kyrgyz Republic, Bishkek, st. Turusbekova, 109/1, 4th floor, office. 416.
Contact information for inquiries: avelumpartner@avp.kg.
The subject of the request is the provision of services of special equipment with a crew to perform construction, mining and auxiliary work at the Solton-Sary mine in the Naryn region.
The duration of services is from 2 months with the possibility of extension by agreement of the parties. Operating mode of equipment: one or two shifts of 10 hours. Food, accommodation, travel, personal protective equipment for drivers and drivers and other personnel-related expenses are included in the price of the proposal.
Equipment requirements
The equipment must be technically sound, in working order and meet safety requirements. Year of manufacture - no earlier than 2020, unless otherwise agreed in writing by the Customer.
The customer has the right to inspect the equipment before concluding a contract or before permission to work and reject units that do not meet the declared characteristics.
| Category | Technique | Main Features | Quantity |
|---|
| Lifting and mounting | Truck crane, one shift | Load capacity 25 tons | 2 units |
| Lifting and mounting | Truck crane, one shift | Load capacity 75/80 tons | 1 unit |
| Lifting and mounting | Aerial platform, one shift | Lifting height no less than 28 m | 2 units |
| Digging | Excavator, two shifts | Bucket capacity not less than 2 m³ | 5 units |
| Digging | Bulldozer, two shifts | Heavy class | 2 units |
| Digging | Front loader, two shifts | Bucket volume not less than 3 m³ | 2 units |
| Road construction | Road roller, two shifts | Weight not less than 17 tons | 2 units |
| Road construction | Motor grader, two shifts | Heavy or medium class | 1 unit |
| Transport | Dump truck, two shifts | Dump truck | 16 units |
| Transport | Dump truck with soil separator, two shifts | With separator installed | 4 units |
| Transport | Water carrier, two shifts | For technological needs | 1 unit |
| Concrete | Concrete mixer truck, one shift | Drum volume 3 m³ | 3 units |
| Drilling | Self-propelled drilling rig | Auger 500 mm, depth up to 5 m | 1 unit |
Responsibility and safety
Responsibility for industrial, environmental safety, occupational health and safety rests entirely with the Contractor in accordance with the legislation of the Kyrgyz Republic.
If the equipment malfunctions, the Contractor is obliged to replace it with an equivalent one within 24 hours. Downtime due to the Contractor's fault is not paid; for untimely mobilization or downtime, a fine of 0.5% of the daily rental cost for each hour may be applied.
The Solton-Sary mine is a sensitive industrial facility. The Contractor provides lists of personnel for passes, provides induction training, compliance with security requirements and the availability of identification documents.
- —
Personnel must have permission to work in mining conditions and undergo training.
- —
Workers use hard hats, safety vests, overalls, safety shoes and other PPE.
- —
Being in a state of intoxication, violating the speed limit, unauthorized changes in routes, and off-task work are prohibited on the territory.
Evaluation criteria and application submission
Applications are submitted electronically to avelumpartner@avp.kg. The application must contain a commercial proposal, a list of equipment with supporting documents and a complete package of documents in accordance with the terms of the request.
Application deadline: March 27, 2026.
Participation means acceptance of all terms and conditions of the competition documentation. The customer has the right to reject all applications without giving reasons. Based on the results of the request, a rental agreement for special equipment with the crew is concluded.
- 01
Complete compliance with the mandatory list of equipment.
- 02
Technical condition of the equipment.
- 03
Experience in similar projects.
- 04
Cost of providing services.
- 05
Time frame for mobilizing equipment to the site.