
This report has been prepared by the representatives of Emegchil village of the Min-Bulak rural administration and outlines the work carried out, activities conducted, and the socio-economic and infrastructural support provided in 2024–2025 within the framework of mutual cooperation with Avelum Partner LLC.
The main purpose of this report is to systematically describe the company’s contribution to rural development, demonstrate the results achieved, and establish a foundation for further cooperation.
Avelum Partner LLC, adhering to the principles of social responsibility in its operations, has implemented a number of significant initiatives aimed at improving the living conditions of the local population, developing infrastructure, and strengthening social cohesion. The activities carried out in 2024–2025 were focused on improving the social well-being of villagers, promoting environmental awareness, enhancing conditions in educational institutions, and providing assistance to vulnerable groups. The work performed is described in detail below.
(April 12, 2024)
On April 12, 2024, a public meeting was held at the village cultural center of the Min-Bulak rural administration. The purpose of the meeting was to establish an open dialogue between the community and the company.
Approximately 150 village residents, members of the council of elders, youth representatives, and the management of Avelum Partner LLC participated in the meeting. The main topic of discussion was the development of the Solton-Sary gold mining site.
Residents openly expressed their views and discussed potential social, environmental, and economic issues that could arise in the future. This discussion made it possible to identify key concerns of the community in advance. The residents put forward several specific demands, including:
Employment opportunities for local residents
Use of equipment within the village
Environmental safety
Active support in addressing the village’s social issues
It was also decided to allocate 20 million KGS annually as a social package, to be directed toward infrastructure development and the renovation of social facilities.
After hearing these demands, the company’s management expressed its willingness to operate within the legal framework and in accordance with the principles of social responsibility. As a result, the residents agreed, and mutual trust between the parties was strengthened.
(April 13, 2024)
On April 13, 2024, an environmental greening initiative was organized at the initiative of Avelum Partner LLC. Employees of the company, village representatives, activists, and local residents actively participated in the event.
The main objective of the initiative was to maintain ecological balance, improve air quality in the region, and create a green environment for future generations.
As part of the event, tree planting was carried out in designated areas. Each participant contributed, and the greening process was conducted at a high level. In addition, participants received information about the importance of environmental protection, nature conservation, and proper tree care.
These efforts contributed to raising environmental awareness and increasing the sense of responsibility among young people toward nature. The social significance of the event was also considerable. The residents highly appreciated the company’s socially responsible initiative and expressed support for continuing such environmental projects in the future.
This activity strengthened trust between the company and the local community and contributed to the development of long-term cooperation.
In conclusion, the greening initiative of April 13 is considered a significant socio-environmental project aimed at maintaining ecological balance, improving air quality, creating a green environment for future generations, and strengthening social cooperation between the company and the local community. It is important to continue such initiatives and encourage active participation of village residents.
(July 10, 2024)
On July 10, 2024, a ceremonial capsule-laying event was held to mark the launch of the gold processing plant in Solton-Sary. The event was attended by representatives of Avelum Partner LLC, local authorities, and members of the rural community.
The launch of the plant created conditions for several significant socio-economic transformations, including:
Job creation – The opening of the plant provided employment opportunities for local residents, contributing to a reduction in unemployment in the region.
Increased budget revenues – The plant’s operations generated additional income for the local budget, expanding opportunities for financing infrastructure and social projects.
Infrastructure development – The commissioning of the plant contributed to improvements in roads, communication systems, and services in the region. It also created conditions for improving living standards and enhancing the economic stability of the village.
The capsule-laying ceremony symbolized the commissioning of the plant and inspired strong expectations for economic and social development in the region. This event represents an important step toward expanding employment opportunities, developing infrastructure projects, and promoting regional growth.
In conclusion, the commissioning of the gold processing plant in Solton-Sary is a significant project aimed at promoting socio-economic development, creating new jobs, increasing budget revenues, and improving infrastructure conditions. It is important to continue supporting the plant’s operations and strengthening cooperation with the local community.
(November 15, 2024)
On November 15, 2024, Avelum Partner LLC provided substantial material assistance to Emegchil village as part of its social commitments. A total of 14,000,000 KGS was allocated, and a HOWO truck and an excavator were purchased and transferred to the village to improve infrastructure and support the livelihoods of residents.
These vehicles made a significant contribution to addressing the village’s social and infrastructural challenges, particularly in the following areas:
Repair and maintenance of internal roads – The new equipment improved road quality and created more comfortable transportation conditions.
Canal cleaning – The machinery was actively used to restore water flow and ensure efficient use of water resources.
Waste management and emergency response – The excavator and truck enabled rapid response to emergencies, enhancing the safety of residents.
Job creation – Several villagers were employed as drivers, operators, and maintenance personnel, expanding economic opportunities and providing stable employment.
This project is considered a significant contribution to the long-term development and socio-economic stability of the village. The acquisition of the HOWO truck and excavator represents an important socio-economic initiative aimed at supporting agricultural and infrastructure projects, creating jobs, and fostering village development. It is important to continue such technically and socially significant initiatives.
(December 7, 2024)
On December 7, 2024, representatives of Emegchil village within the Min-Bulak rural administration, together with Avelum Partner LLC, conducted a working visit to the Solton-Sary gold mining facility. The main purpose of the visit was to observe ongoing operations, review technological processes, and assess the transparency of the company’s activities.
During the visit, participants toured key facilities and reviewed the progress of construction and production activities. Company representatives provided detailed information on mining technologies, safety measures, and operational stages, allowing participants to receive clear and comprehensive answers to their questions.
Environmental issues attracted particular attention during the meeting. Participants raised questions regarding environmental protection and soil impact. The company’s management stated that all environmental standards are strictly observed, close cooperation is maintained with regulatory authorities, and additional environmental protection measures are being implemented.
Employment opportunities for local residents were also discussed. Participants reviewed current and future job opportunities, working conditions, and salary levels. The company confirmed that priority would be given to hiring local residents wherever possible and that job creation would increase gradually.
(December 16, 2024)
To support socially vulnerable groups during the winter period, improve living conditions, and ensure adequate heating, Avelum Partner LLC organized a coal distribution initiative on December 16, 2024.
A total of 80 tons of coal was distributed through the Min-Bulak rural administration to help meet winter fuel needs and provide heating for households. The coal was allocated to genuinely needy families based on lists prepared by social protection authorities.
Out of the total amount:
60 tons were delivered to Emegchil village
20 tons were delivered to Lakhol village
Distribution was carried out fairly and transparently under the supervision of local administration staff and responsible representatives.
As a result, heating issues for many low-income families were resolved, significantly improving their social conditions. This assistance was especially important for elderly individuals, single mothers, large families, and vulnerable households.
In conclusion, this initiative was implemented within the framework of social responsibility and strengthened public trust in the company. It is important to continue such socially oriented support activities in the future.
(March 2025)
In March 2025, Avelum Partner LLC organized an iftar (fast-breaking meal) for the residents of Emegchil village.
The event was held to provide social and spiritual support, as well as to strengthen unity and community engagement among villagers.
A total of 50,000 KGS was allocated for the event, covering all expenses related to food preparation and organization.
Residents from various social groups were invited, including elderly individuals, large families, single mothers, and other vulnerable members of the community.
Food distribution during the event was carried out fairly and transparently, and all necessary conditions were created for participants. The organizers paid special attention to preserving cultural traditions and creating a warm and welcoming atmosphere for the open-air gathering.
This event made a significant contribution to strengthening community unity and enhancing the spiritual well-being of residents. It also reminded villagers of the importance of mutual support and solidarity.
In conclusion, the iftar event strengthened social ties, enhanced community cohesion, and demonstrated the company’s ongoing social support for the local population. It is important to continue organizing similar socially and spiritually meaningful events in the future.
(March 2025)
In March 2025, Avelum Partner LLC acquired a range of technical equipment to support local production development and provide the population with high-quality products.
As part of this initiative, the following equipment was purchased and fully commissioned:
A flax pressing machine worth 500,000 KGS
A feed mill worth 700,000 KGS
The main objective of this equipment is to improve product quality and ensure the supply of clean, environmentally safe products to the population.
With the commissioning of the new equipment, the production process became more efficient and of higher quality, providing significant support to local farmers and small industrial enterprises.
During the commissioning process, comprehensive measures were taken to ensure proper installation, compliance with safety standards, and staff training. As a result, stable and uninterrupted operation of the equipment was achieved, and overall production efficiency improved.
This initiative created conditions for supplying high-quality food and feed products, bringing both economic and social benefits to the community. It represents an important step toward strengthening the village’s production capacity and improving the living standards of residents.
In conclusion, the acquisition and implementation of new technical equipment contributed to the development of local industry, improved product quality, and enhanced economic stability. It is important to continue such investment and socially oriented initiatives.
(April 12, 2025)
On April 12, 2025, the “Green Heritage” project was launched in Emegchil village at the initiative of Avelum Partner LLC.
As part of the project, 200 trees were planted to protect the environment, improve ecological conditions, and create a clean and green environment for residents.
The event involved local residents, school students, and active youth, all of whom participated actively in tree planting. Organizers provided detailed guidance on land preparation, site selection, and proper planting techniques.
The “Green Heritage” project aims to improve the village’s ecological conditions, stabilize the local climate, and enhance the quality of life. The planted trees will contribute to air purification and long-term environmental sustainability.
The initiative also increased environmental awareness among residents and encouraged greater interest in environmental protection, particularly among young people.
In addition, the project strengthened community unity and increased local participation in social initiatives.
In conclusion, the “Green Heritage” project is a long-term environmental initiative that contributes significantly to village greening and environmental protection. It is important to continue such environmentally and socially impactful projects and ensure community involvement.
(2025)
In 2025, repair works were carried out on the Ak Marcha canal in Emegchil village using funds allocated by Avelum Partner LLC. A total of 700,000 KGS was allocated for this project, aimed at modernizing outdated infrastructure and ensuring uninterrupted irrigation water supply.
The works included technical assessment of the canal, replacement of damaged sections, and restoration using specialized equipment and materials.
Local residents, technical specialists, and responsible personnel participated in the project, ensuring quality control at every stage.
The rehabilitation of the canal ensured reliable water supply to irrigated lands, contributing to increased agricultural productivity and economic efficiency.
As a result, residents improved their water management practices, and the canal’s infrastructure was significantly upgraded. This project improved living standards and strengthened the socio-economic condition of the community.
In conclusion, the reconstruction of the Ak Marcha canal is a significant infrastructure project aimed at ensuring sustainable agricultural production. It is important to continue such initiatives and encourage community participation.
(2025)
In 2025, the construction of the Chetki-Ayryk canal in the Uch-Chat section was carried out with funding provided by Avelum Partner LLC. A total of 1,800,000 KGS was allocated for this project.
The construction aimed to ensure uninterrupted irrigation water supply and support stable agricultural production in the village.
The project included route planning, optimization of water flow, land preparation, and full-scale construction of canal infrastructure. Local technical specialists, responsible personnel, and village residents participated in the project, ensuring quality control at every stage.
The construction of the canal enabled local farmers to ensure stable irrigation, improving crop quality and productivity. It also contributed to improving the socio-economic conditions of residents and strengthening agricultural sustainability.
As a result, villagers gained knowledge of efficient water resource management and received training in maintenance and operation of the canal.
In conclusion, this project is a significant infrastructure initiative aimed at improving irrigation, increasing agricultural productivity, and strengthening economic stability. It is important to continue such socially and economically impactful projects.
(2025)
In 2025, social assistance was provided to the family of Asylbek Uulu Azamat, who tragically passed away in an accident. The support was funded by Avelum Partner LLC, with a total allocation of 100,000 KGS.
The assistance was aimed at covering essential needs, including food and basic living expenses. This support helped the family cope with financial difficulties and provided both material and psychological relief.
To ensure transparency and proper use of funds, monitoring was carried out by company representatives and local authorities.
This initiative demonstrated the importance of social responsibility and mutual support within the community. As a result, the family’s situation improved, and public trust in the company increased.
In conclusion, this support represents an important social measure aimed at assisting families in difficult circumstances. It is essential to continue such initiatives in the future.
(September 2025)
In September 2025, the school canteen named after T. Bayburaev was fully renovated using funds allocated by Avelum Partner LLC. A total of 830,000 KGS was invested in the renovation and procurement of new equipment.
The renovation included improvements to walls, floors, and sanitary conditions, bringing them in line with modern standards. New equipment was also purchased, including kitchen appliances, utensils, worktables, and other essential items.
The main objective was to improve students’ health conditions, enhance food quality, and ensure compliance with sanitary and hygiene standards.
The upgraded canteen now provides students with safe, high-quality meals. School administration, local staff, and company representatives participated in the project, ensuring quality control.
In conclusion, this project significantly improved school infrastructure and contributed to better learning and working conditions. It is important to continue such initiatives.
(September 2025)
In September 2025, the interior of the “Emgekchil Kelechegi” kindergarten in Emegchil village was renovated using funds from Avelum Partner LLC. A total of 820,000 KGS was allocated for this project.
The renovation included inspection of all premises and replacement of outdated furniture that did not meet safety standards. New furniture included tables, chairs, benches, and play equipment.
The updated interior created safe, comfortable, and modern conditions for children.
The project involved kindergarten staff, local specialists, and company representatives, ensuring quality and safety at all stages.
In conclusion, this initiative improved infrastructure, supported child development, and enhanced sanitary conditions. It is important to continue such socially significant projects.
(2025)
In 2025, a sewing workshop was established at the B. Zhakypov Vocational Lyceum in Emegchil village with funding from Avelum Partner LLC. A total of 500,000 KGS was allocated for sewing machines and equipment.
Additionally, a refrigerator and stove were provided for the lyceum kitchen.
The main goal was to train young women in sewing skills and create employment opportunities. The workshop expanded economic opportunities and supported professional development.
Local specialists and company representatives ensured proper setup, training, and operational efficiency.
This initiative helped reduce unemployment and improve socio-economic conditions. It is important to continue such projects.
(October 2025)
In October 2025, a new two-section Lovol combine harvester was purchased for Emegchil village using funds from Avelum Partner LLC. A total of 7,100,000 KGS was allocated.
The harvester improves efficiency in grain harvesting and reduces labor intensity. Training was provided to farmers and operators on safe and effective use.
As a result, agricultural productivity increased, food security improved, and economic stability strengthened.
(November 17, 2025)
On November 17, 2025, representatives and management of Avelum Partner LLC held a meeting at the Solton-Sary gold mining facility.
Key topics discussed included:
Environmental protection
Employment opportunities
Equipment usage in the village
Safety measures
All parties proposed solutions and developed action plans. This meeting strengthened cooperation and improved transparency.
(2025)
In 2025, a new bulldozer will be purchased for the village with an allocated budget of 10,000,000 KGS.
The equipment will be used for road repairs, irrigation improvements, and agricultural support. It will also create jobs and improve infrastructure efficiency.
Representatives conducted meetings with residents to provide information about the company’s activities, including employment, infrastructure development, environmental protection, and social support.
Residents actively participated, asked questions, and provided feedback. The company emphasized transparency and compliance with regulations.
These meetings strengthened trust and improved cooperation between the company and the community.
Overall, cooperation between Avelum Partner LLC and the representatives of Emegchil village within the Min-Bulak rural administration in 2024–2025 proved to be productive and effective.
The company implemented numerous social, economic, and infrastructure projects, significantly improving living conditions. These initiatives strengthened social cohesion, increased trust, and supported local development.
This experience provides a strong foundation for future cooperation and sustainable rural development.