- On the site roads
- 48road signs installed to GOST standards
- From the mine grounds
- 39.3 tof accumulated household waste removed
Water
- A contract for regular laboratory testing of drinking water.
- A treatment facility is being installed for the residential complex. Technical water is planned for site use.
Contract and treatment facilities
- An agreement has been concluded with the Naryn Center for Disease Prevention for regular laboratory testing of drinking water.
- A wastewater treatment facility is being installed for the employees' residential complex. Process water is intended for use on site.
Waste and site maintenance
- Household waste disposal under a contract with Emgekchil Onuguu municipal enterprise.
- The pit, road to the plant, plant grounds and workers' camp have been cleaned.
Waste disposal and site cleanup
- An agreement was concluded with the Emgekchil Onuguu MP for the removal, reception, placement and disposal of solid waste.
- The Altyn-Tor quarry, the technological road to the factory, the territory of the factory and the rotation camp have been cleared.
Operational safety
- An emergency response plan has been prepared for the plant and tailings facilities.
- Safety briefings on hiring, quarterly and whenever needed.
- Work and specialist instructions have been prepared.
Emergency plan and work instructions
- An emergency response plan has been developed for the processing plant and tailings storage facilities.
- Employees undergo safety and labor protection training upon arrival, quarterly and where necessary.
- Job, work and special instructions have been developed for engineers, workers, construction professions and hydraulic structures.
Environmental passport
- The Solton Sary mine's environmental passport is being developed.
Requirements and documentation
- An environmental passport for the Solton-Sary mine is being developed.
The mine complies with Kyrgyz Republic legislation on industrial and environmental safety and subsoil protection.